Full House Renovation

Our extensive full house renovation involved gutting to the studs, installing new plumbing/electrical, and meticulously installing finishes, fixtures, and equipment. We transformed the kitchen into a modern space with a wine bar and created an open flow using an LVL beam. All bathrooms were remodeled while retaining existing fixture locations. ALIGN managed construction, overseeing finish selection and layout reconfiguration

Full House Renovation

Our extensive full house renovation project involved a complete gutting down to the studs, along with the installation of new plumbing and electrical systems. We meticulously implemented finishes, fixtures, and equipment throughout the new footprint. The kitchen underwent a significant transformation with a modern layout featuring a wine bar. We added an LVL beam to achieve an open flow between the kitchen and dining area. Every bathroom received a makeover with all-new finishes and fixtures. ALIGN oversaw the construction process as the project manager, overseeing the selection of finishes and the reconfiguration of the new layout.

before

before

Follow me on instagram, or email me to get in touch.

Beaufort, NC | 973 768-7060[email protected]