Full House Renovation
Our extensive full house renovation involved gutting to the studs, installing new plumbing/electrical, and meticulously installing finishes, fixtures, and equipment. We transformed the kitchen into a modern space with a wine bar and created an open flow using an LVL beam. All bathrooms were remodeled while retaining existing fixture locations. ALIGN managed construction, overseeing finish selection and layout reconfiguration
- Comprehensive full house reconfiguration
- Selection and installation of all new finishes + fixtures
- Project management overseeing construction + design
Full House Renovation
Our extensive full house renovation project involved a complete gutting down to the studs, along with the installation of new plumbing and electrical systems. We meticulously implemented finishes, fixtures, and equipment throughout the new footprint. The kitchen underwent a significant transformation with a modern layout featuring a wine bar. We added an LVL beam to achieve an open flow between the kitchen and dining area. Every bathroom received a makeover with all-new finishes and fixtures. ALIGN oversaw the construction process as the project manager, overseeing the selection of finishes and the reconfiguration of the new layout.
- Comprehensive full house reconfiguration
- Selection and installation of all new finishes + fixtures
- Project management overseeing construction + design
Follow me on instagram, or email me to get in touch.
Beaufort, NC | 973 768-7060 | [email protected]